WBS200-204 Ultrasonic Wind Speed and Direction Sensor

Wind Monitoring · integrated wind speed/direction / ultrasonic / special · Shanghai Webo Electric

WBS200-204
💨 Wind Monitoring · integrated wind speed/direction / ultrasonic / special
Model: WBS200-204

Ultrasonic Wind Speed and Direction Sensor

The ultrasonic wind speed and direction instrument is convenient, accurate, and flexible for many fields. It is widely used in urban environmental monitoring, wind power generation, meteorological monitoring, bridges and tunnels, marine vessels, aviation airports, metro systems, tunnels and mining, fan manufacturing, and industries that require ventilation and exhaust systems.
DC9~24V
Operating Voltage
0~60m/s
Measurement Range
Stainless steel
Material
✦
Product Overview

The WBS200-204 series ultrasonic wind speed and direction sensor uses the ultrasonic time-difference method to measure wind speed and direction. It offers high measurement accuracy, reliable performance, easy portability, no moving parts, and no need for maintenance or on-site calibration, making it an advanced instrument for wind speed and direction measurement. Because it overcomes the inherent defects of mechanical wind speed and direction instruments, it can operate normally for long periods in all weather and is being used increasingly widely. It is a strong replacement for mechanical anemometers.

✦
Product Features
  • Original integrated stainless-steel appearance with a refined look. Advanced sensing technology enables real-time measurement with no starting wind-speed limit and no angle limit, while acquiring both wind speed and wind direction data.
  • Multiple ultrasonic probes transmit and receive ultrasonic signals in real time within the measurement space, ensuring efficient real-time parameters.
  • High measurement accuracy, wide range, strong stability, low power consumption, strong interference resistance, all-weather operation, and no calibration required.
  • Precision workmanship and all-solid-state design create a stronger structure with high strength, weather resistance, corrosion resistance, waterproofing, and long service life.
  • Professional integrated mounting, compact size, and easy carrying and installation.
  • It can be powered by matching solar panels and batteries, transmit measurement data remotely and wirelessly, and support long-distance remote monitoring. It is widely applicable to unattended remote areas such as harsh high-mountain and island environments.
📋
Performance Specifications
Measurement Range0~60m/s,0~70m/sResponse Time1s
Accuracy±0.3m/s or ±3%(0~30m/s) or ±5%(30~70m/s) whichever is greaterResolution0.1m/s
Measurement Range0-360°Resolution0.1 °
Accuracy±2 °Response Time1s
Operating VoltageDC9~24VOperating Temperature-20℃~60℃
IP ProtectionIP66Operating Humidity0%~95%RH
Output SignalRS485、0~5VDC、4~20mAStarting Wind Speed≤0.1m/s
Operating Currentstandard type:standard type:standard type:MaterialStainless steel
Note: If technical specifications or cable definitions differ from the actual product, the actual order shall prevail.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List