WBS200-205 Integrated Wind Speed and Direction Sensor

Wind Monitoring · integrated wind speed/direction / ultrasonic / special · Shanghai Webo Electric

WBS200-205
💨 Wind Monitoring · integrated wind speed/direction / ultrasonic / special
Model: WBS200-205

Integrated Wind Speed and Direction Sensor

This product can measure sixteen indoor and outdoor wind directions including east, west, south, north, southeast, southwest, northeast, and northwest. It is widely used for wind speed and direction measurement in construction machinery (cranes, crawler cranes, gantry cranes, tower cranes, etc.), railways, ports, docks, power plants, meteorology, cableways, environmental monitoring, greenhouses, aquaculture, air conditioning, energy-saving monitoring, agriculture, medical facilities, clean rooms, and other fields. WBS200-205 Integrated Wind Speed and Direction Sensor
DC12~30V
Operating Voltage
0-50m/s
Measurement Range
Aluminum alloy
Material
✦
Product Overview

This integrated wind speed and direction sensor measures wind speed and wind direction values and converts them into electrical signals that can be sent directly to recording equipment for processing. The sensor housing uses aluminum alloy and precision die-casting with special molds, giving it tight dimensional tolerances, high surface precision, high weather resistance, strength, corrosion resistance, and waterproof performance. Internal circuits are protected so the sensor adapts well to harsh environments. The cable connector is a military-grade plug with good corrosion and erosion resistance for long-term use. Together with the imported internal bearing system, it ensures accurate wind speed and direction acquisition. The PCB circuit module uses military-grade Class A materials for stable parameters and electrical quality. Imported industrial-grade chips give the unit highly reliable electromagnetic interference resistance and allow normal operation at -20°C to +50°C and 35%-85% humidity (non-condensing).

✦
Product Features
  • Compact size, easy to carry, easy to install, and refined appearance.
  • Strong corrosion resistance and weather resistance.
  • High measurement accuracy, wide range, and good stability.
  • Low power consumption, strong interference resistance, and stable long-term operation.
  • Wide power-supply adaptability, good data linearity, and long signal transmission distance.
📋
Performance Specifications
RangeWind speed: 0-50m/s; wind direction: 16 directions (0-360 degrees)
AccuracyWind speed: ±0.5 m/s (<5 m/s); ±3% FS (≥5 m/s). Wind direction: 16 directions, ±3°; resolution: 22.5°.
Voltage Output Type0-5VDC、0-10VDC
Current Output Type4-20mA
digital typeRS485(Modbus RTU)
Power SupplyDC12~30V,DC15~30V(0-10VDC output)
maximum power consumption (DC24V)voltage type MAX≤300mW; current type MAX≤500mW;RS485 type MAX≤300mW
starting wind force≥1 wind force level
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List