WBS200-208 Ultrasonic Wind Speed and Direction Sensor
Wind Monitoring · integrated wind speed/direction / ultrasonic / special · Shanghai Webo Electric
Wind Monitoring · integrated wind speed/direction / ultrasonic / special · Shanghai Webo Electric
The ultrasonic wind speed and direction sensor uses the ultrasonic time-difference method to measure wind speed and direction. It offers high measurement accuracy, reliable performance, easy portability, and no moving parts. Under normal conditions, it requires no maintenance or on-site calibration, making it an advanced instrument for wind speed and direction measurement. Because it overcomes the inherent defects of mechanical wind speed and direction instruments, it can operate normally for long periods in all weather and is being used increasingly widely. It is a strong replacement for mechanical wind speed and direction instruments.
| Measurement Range | 0~50m/s (other ranges require customization) | Response Time | <3s |
| Starting Wind Speed | 0.1m/s | Resolution | 0.1m/s |
| Accuracy | ±0.3m/s or ±3%(0~30m/s) or ±5%(30~50m/s) whichever is greater | ||
| Measurement Range | 0~360° | Wind Direction Accuracy | ±2 ° |
| Starting Wind Speed | 0.1m/s | Resolution | 0.1 ° |
| digital signal | RS485 | Operating Current | <35mA(12VDC) |
| Analog Signal | 0~5/0~10V or 4~20mA | Operating Temperature | -20℃~60℃ |
| Baud Rate | 2400~115200 | Operating Humidity | 0%~95%RH |
| Supply Voltage | 12~24VDC | Protection | IP65 |
