Suitable for wind speed monitoring in factories, power facilities, ports, industrial and mining sites, wind turbines, large mechanical equipment, and similar applications.
DC12-30V
Operating Voltage
0~30m/s 0~50m/s 0~60m/s
Measurement Range
Aluminum alloy / polyester coating
Material
✦
Product Overview

The wind speed sensor produced by our company is a high-reliability, high-performance wind speed sensor. The series can stably and accurately collect ambient wind speed signals and is suitable for high-altitude operations, construction machinery, port machinery, and similar applications. It has built-in digital circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. The sensor circuit collects wind-cup rotation speed and outputs an electrical signal linearly related to ambient horizontal wind speed. Main structural parts are made from alloy materials with surface treatment. The product offers good waterproof and anti-aging performance, and the internal and rotating parts use sealed designs to effectively prevent ingress of water, salt mist, dust, and sand.

✦
Product Features
  • Developed based on a non-contact magnetic sensing measurement principle.
  • Built-in high-performance sensor delivers accurate and reliable data acquisition.
  • Wide wind speed measurement range and low starting wind speed.
  • The wind speed sensor uses an all-metal housing with good corrosion resistance and strong wind resistance.
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • Complies with CE EMC standards and uses multi-stage lightning and surge protection design.
  • Can operate across a wide 12-30 VDC voltage range.
📋
Performance Specifications
Measurement Range0~30m/s、0~50m/s、0~60m/sOutput Signal4~20mA、RS485
Accuracy±0.5m/s(<5m/s)、±3%FS(≥5m/s)Operating VoltageDC12-30V
Starting Wind Speed≤0.5m/sWind Resistance>70m/s
Operating Temperature-20℃~+85℃Operating Humidity0%~95% (non-condensing)
ESD Protection15KVProtection RatingIP65
Wind Cup MaterialAluminum alloy / polyester coating