WBS200-203 Pendulum Wind Speed Sensor

Wind Monitoring · Wind Speed Sensor · Shanghai Webo Electric

WBS200-203
💨 Wind Monitoring · Wind Speed Sensor
Model: WBS200-203

Pendulum Wind Speed Sensor

Suitable for wind speed monitoring in factories, power facilities, ports, industrial and mining sites, wind turbines, large mechanical equipment, and similar applications.
12-30VDC,5V/24V(pulse)
Operating Voltage
0~50m/s 0~30m/s
Measurement Range
Aluminum alloy / polyester coating
Material
✦
Product Overview

The pendulum wind speed sensor is developed for large hoisting and cantilever machinery. It is an intelligent wind speed sensing device with self-adjusting vertical angle. The wind cups are made of quality aluminum alloy with high mechanical strength and strong wind resistance, and resin coating prevents rust during outdoor installation. It is mainly suitable for crawler cranes, truck cranes, and open-air equipment subject to vibration, jolting, and large tilt changes. It can collect real-time actual wind speed from the external environment and output the corresponding signal.

✦
Product Features
  • Developed based on a non-contact magnetic sensing measurement principle.
  • Built-in high-performance sensor delivers accurate and reliable data acquisition.
  • Wide wind speed measurement range and low starting wind speed.
  • The wind cups use aluminum alloy and can be used in harsh conditions.
  • The pendulum wind speed sensor uses an all-metal housing with good corrosion resistance and strong wind resistance.
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • Complies with CE EMC standards and uses multi-stage lightning and surge protection design.
  • can operate at 15-30VDC operates within a wide voltage range;
📋
Performance Specifications
Operating Voltage12-30VDC,5V/24V(pulse)Measurement Range0~50m/s、0~30m/s
Starting Wind Speed≥0.5m/sWind Resistance>70m/s 30min
Accuracy±0.5m/s(<5m/s);±3%FS(≥5m/s)Protection RatingIP65
Operating Temperature-20℃~+85℃ESD Protection15KV
Operating Humidity0%~95% (non-condensing)Output Signal4~20mA / 0~5VDC / 0~10VDC / pulse / RS485 (Modbus)
Main Body MaterialAluminum alloy / polyester coating
Note: Specific electrical performance and wiring definitions are subject to the actual product.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List