WBS200-201B Anti-icing Wind Speed Sensor

Wind Monitoring · Wind Speed Sensor · Shanghai Webo Electric

WBS200-201B
💨 Wind Monitoring · Wind Speed Sensor
Model: WBS200-201B

Anti-icing Wind Speed Sensor

Suitable for applications that still require accurate wind speed and direction measurement under harsh climate conditions such as deserts, wind power generation sites, ultra-low temperatures, freezing rain, snow, frost, and high humidity.
18-36VDC
Operating Voltage
0-50m/s
Measurement Range
Aluminum alloy
Material
✦
Product Overview

The anti-icing wind speed sensor is a wind-parameter sensor developed for natural environments with lightning, rainstorms, low temperatures, heavy sand and dust, and strong winds, where resistance to extreme environmental factors is required. It has built-in analog circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. It collects wind-cup rotation speed and outputs an electrical signal linearly related to ambient horizontal wind speed. The anti-icing wind speed sensor meets the need for accurate wind speed measurement under harsh climate conditions such as deserts, wind power generation sites, ultra-low temperatures, freezing rain, snow, frost, and high humidity.

✦
Product Features
  • Developed based on non-contact magnetic sensing measurement principles, with high data acquisition accuracy and strong reliability
  • The wind speed sensor uses materials with good corrosion resistance and strong wind resistance
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • can operate at 18-36V DC operates within a wide voltage range
  • Wide wind speed measurement range and low starting wind speed.
  • Multi-level lightning and surge protection design
📋
Performance Specifications
Measurement Range0-50m/sOutput Signal4~20mA/0~20mA/0~5V/0~10V
Operating Voltage18-36VDCheating start temperature6℃±2℃
heating voltage24VDC(120W)heating stop temperature60℃±5℃
Starting Wind Speed≤0.5m/sWind Resistance≥60m/s
Accuracy±0.5m/s(VL≤30m/s);3%FS(VL>30m/s)Resolution0.1m/s
Operating Temperature-40~+70℃ESD Protection15KV
Operating Humidity0-100% relative humidityWind Cup MaterialAluminum alloy
Protection RatingIP66
Note: If technical specifications or cable definitions differ from the actual product, the actual order shall prevail.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List