WBS200-1002 Wind Speed Sensor

Wind Monitoring · Wind Speed Sensor · Shanghai Webo Electric

WBS200-1002
💨 Wind Monitoring · Wind Speed Sensor
Model: WBS200-1002

Wind Speed Sensor

Suitable for wind speed monitoring in factories, power facilities, ports, industrial and mining sites, wind turbines, large mechanical equipment, and similar applications.
12–30 VDC
Operating Voltage
0~50m/s
Measurement Range
PC + nylon
Material
✦
Product Overview

The wind speed sensor produced by our company is a high-reliability, high-performance wind speed sensor. The series can stably and accurately collect ambient wind speed signals and is suitable for high-altitude operations, construction machinery, port machinery, and similar applications. It has built-in digital circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. The sensor circuit collects wind-cup rotation speed and outputs an electrical signal linearly related to ambient horizontal wind speed. Main structural parts are made from PC + nylon composite material with surface treatment. The product offers good waterproof and anti-aging performance, and the internal and rotating parts use sealed designs to effectively prevent ingress of water, salt mist, dust, and sand.

✦
Product Features
  • Developed based on a non-contact magnetic sensing measurement principle.
  • Built-in high-performance sensor delivers accurate and reliable data acquisition.
  • Wide wind speed measurement range and low starting wind speed.
  • The main structural components use PC and nylon, with sealed construction for outdoor use.
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • Complies with CE EMC standards and uses multi-stage lightning and surge protection design.
  • Can operate across a wide 12-30 VDC voltage range.
📋
Performance Specifications
Measurement Range0~50m/sOperating Voltage12–30 VDC
Accuracy±0.5m/s(<5m/s);±3%FS(≥5m/s)Wind Resistance>70m/s
Starting Wind Speed≥0.5m/s
Operating Temperature-20℃~+85℃Protection RatingIP65
ESD Protection15KVWind Cup MaterialPC + nylon
Output Signal4~20mA,RS485(Modbus),0-5V,0-10V
Note: If technical specifications or cable definitions differ from the actual product, please refer to the order technical specifications.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List