Suitable for wind direction monitoring in factories, power facilities, ports, industrial and mining sites, wind turbines, large mechanical equipment, and similar applications.
15-30V DC
Operating Voltage
0~360°
Measurement Range
Aluminum alloy / polyester coating
Material
✦
Product Overview

This wind direction sensor is a high-reliability, high-performance wind direction sensor. The series can stably and accurately collect ambient wind direction signals and is suitable for high-altitude operations, construction machinery, port machinery, and similar applications. It has built-in digital circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. The circuit collects the wind vane position signal and outputs an electrical signal linearly related to ambient wind direction. The main structural parts are made from alloy materials with surface treatment. The product offers good waterproof and corrosion-resistant performance, and the internal and rotating parts use sealed designs to effectively prevent ingress of water, salt mist, dust, and sand.

✦
Product Features
  • Developed based on a non-contact magnetic sensing measurement principle.
  • Built-in high-performance sensor delivers accurate and reliable data acquisition.
  • The wind direction sensor uses an all-metal housing with good corrosion resistance and strong wind resistance.
  • The wind vane uses stainless steel and can be used in harsh conditions.
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • Complies with CE EMC standards and uses multi-stage lightning and surge protection design.
  • can operate at 15-30V Dc operates within a wide voltage range.
📋
Performance Specifications
Measurement Range0~360°Operating Voltage15-30V DC
Starting Wind Speed≤0.5m/sWind Resistance>70m/s 30min
Accuracy16 directions ±3°, ±2.5°Protection RatingIP65
Operating Temperature-20℃~+85℃ESD Protection15KV
Operating Humidity0%~95% (non-condensing)Output Signal4~20mA、0~5VDC、0~10VDC、RS485(Modbus RTU)
Main Body MaterialAluminum alloy / polyester coating