WBS200-2002 Wind Direction Sensor

Wind Monitoring · Wind Direction Sensor · Shanghai Webo Electric

WBS200-2002
💨 Wind Monitoring · Wind Direction Sensor
Model: WBS200-2002

Wind Direction Sensor

DC12-30V
Operating Voltage
0~360°
Measurement Range
PC + nylon
Material
✦
Product Overview

This wind direction sensor is a high-reliability, high-performance wind direction sensor. The series can stably and accurately collect ambient wind direction signals and is suitable for high-altitude operations, construction machinery, port machinery, and similar applications. It has built-in digital circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. The circuit collects the wind vane position signal and outputs an electrical signal linearly related to ambient wind direction. The main structural parts are made from PC + nylon material with surface treatment. The product offers good resistance to water, salt mist, dust, and sand ingress.

📋
Performance Specifications
Operating VoltageDC12-30VOperating Humidity0%~95% (non-condensing)Protection RatingIP65
Starting Wind Speed≥0.5m/sMeasurement Range0~360°ESD Protection15KV
Accuracy8 directions ±3°Wind Resistance>70m/sMain Body MaterialPC + nylon
Operating Temperature-20℃~+85℃Output Signal4~20mA、RS485
Note: Specific electrical performance and wiring definitions are subject to the actual product.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List