WBS200-202B Anti-icing Wind Direction Sensor

Wind Monitoring · Wind Direction Sensor · Shanghai Webo Electric

WBS200-202B
💨 Wind Monitoring · Wind Direction Sensor
Model: WBS200-202B

Anti-icing Wind Direction Sensor

Suitable for applications that still require accurate wind direction measurement under harsh climate conditions such as deserts, wind power generation sites, ultra-low temperatures, freezing rain, snow, frost, and high humidity.
18-36VDC
Operating Voltage
0~360°
Measurement Range
Aluminum alloy
Material
✦
Product Overview

The anti-icing wind direction sensor is a wind-parameter sensor developed for natural environments with lightning, rainstorms, low temperatures, heavy sand and dust, and strong winds, where resistance to extreme environmental factors is required. It has built-in analog circuits with strong RF resistance, electromagnetic interference resistance, and lightning surge protection. It measures wind direction and converts the measured direction into an electrical output signal. The anti-icing wind direction sensor meets the need for accurate wind direction measurement under harsh climate conditions such as deserts, wind power generation sites, ultra-low temperatures, freezing rain, snow, frost, and high humidity.

✦
Product Features
  • Developed based on non-contact magnetic sensing measurement principles, with high data acquisition accuracy and strong reliability.
  • Multi-level lightning and surge protection design.
  • The circuit protection uses fault-tolerant design, so the sensor will not be damaged if wiring is incorrect.
  • Operates over a wide supply-voltage range of 18–36 VDC.
📋
Performance Specifications
Measurement Range0~360°Output Signal4~20mA/0~20mA/0~5V/0~10V
Operating Voltage18-36VDCheating start temperature6℃±2℃
heating voltage24VDC(120W)heating stop temperature60℃±5℃
Starting Wind Speed≤0.5m/sWind Resistance≥60m/s
Accuracy±2.5°
Operating Temperature-40~+70℃ESD Protection15KV
Operating Humidity0-100% relative humiditySensor MaterialAluminum alloy
Protection RatingIP66
Note: If technical specifications or cable definitions differ from the actual product, the actual order shall prevail.
📖
Selection Guide
Selection Guide
Get a Quote / Selection Consultation Back to Wind Monitoring Product List